Proven delivery on complex infrastructure
60+ projects completed across 11 countries – from Queensland flood resilience to Pacific ports, bridges and operating mines.

Brolga Lakes
Design and construction of CombiLoc lakeside retaining walls supporting retained heights of up to 8.5 metres.

Bells Bridge
Civil Marine assisted its partner Foreshore Marine with construction and resourcing of secant pile walls to improve bridge resilience and provide protection during major flood events.

Lamington Bridge
Civil Marine assisted its partner Foreshore Marine with construction and resourcing of secant and soldier pile walls for riverbank stabilisation and bridge protection.

Gold Coast Rapid Transit
Supply and installation of secant piles.

Kennedy Point Marina
Supply of ArmorPile™ composite marine piles – structural LSAW steel with a fitted UHMWPE sleeve – for the marina’s moorings and wave-attenuation structures. Installed by Heron Construction Co. Ltd.

NZI House
Cutter soil mixed (CSM) basement walls for the NZI House development in central Auckland.

Tauranga Indoor Sports & Events Centre
Cutter-soil-mixing ground improvement: 464 CSM panels of 5 MPa design strength, 10.5–19 m deep, installed with Bauer RG19T plant through silty sands, ash and clayey sand.
NZ$2.4M · Dec 2009–Feb 2010

Boroko Creek Bridge
750 mm bored piles socketed 12–14 m into rock, abutments, Super T girder supply and installation, deck, approaches and furnishings.
K7M · Apr–Aug 2014

Steamships Harbour Offices
Jetty and wharf demolition including underwater cutting, sheet-pile reclamation, bored piling in extremely hard rock, dewatering, over-water car park, mooring piles, rock armour and UXO removal.
K20M · Apr–Nov 2012

Kookaburra Highway Flyover
Foundations for a highway flyover using 1,500 mm diameter kelly-cased bored piles.

Oro Bridges
Fabrication and supply of approximately 1,600 tonnes of structural steel bridge girders and foundation piles.

Lihir Gold Processing Plant
Specialist piling and structural groundworks within a US$1 billion development: bored piles 12–30 m deep through organic soils and volcanic basalt, secant and retaining walls, capping beams and structural steel.
US$30M · Oct 2009–Nov 2010
Engage early. Create delivery certainty.
Talk to us at concept or tender stage – that’s where value engineering saves the most time and cost.